Soil quality control
Verify, while the works proceed, that what is being built matches what was specified.
A poorly compacted embankment or a capping layer outside specification is paid for a few years later, in deformation and repairs. Soil quality control verifies, while the works proceed, that what is being built matches what the specification required.
This service falls under Group I — Soils and foundations of our Category C accreditation from the Ministry of Public Works (MINTP).
What the service covers
Compaction control
- Laboratory determination of Proctor reference values — NF P94-093
- Trial compaction strips to fix the compaction method: number of passes, layer thickness, placement moisture content
- In-situ density measurement
- Light dynamic penetrometer checks — NF P94-105
- Plate bearing tests
- Single deflection tests
Bearing capacity and identification
- CBR bearing ratio — NF P94-078
- Particle size distribution — NF EN 933-1
- Atterberg limits — NF P94-051
- Moisture content and oven drying
- Subgrade classification
- Conformity checks against the specification thresholds
Borrow pits and quarries
- Prospecting and locating borrow areas
- Sampling and identification of materials
- Conformity testing: particle size distribution, plasticity, bearing capacity, Los Angeles abrasion
- Borrow pit approval: a reasoned opinion on whether the material suits its intended use (embankment, capping layer, sub-base, base course)
- Monitoring of extraction and consistency checks
Foundations and earthworks
- Inspection of the excavation formation
- Verification of the bearing capacity of the founding stratum
- Inspection of engineered fill and of structural backfill to hydraulic structures
- Inspection of trenches and utility backfill
Standards applied
| Test | Standard |
|---|---|
| Particle size analysis by sieving | NF EN 933-1 |
| Atterberg limits | NF P94-051 |
| Density of solid particles | NF P94-054 |
| Proctor compaction test | NF P94-093 |
| CBR bearing ratio | NF P94-078 |
| Light dynamic penetrometer | NF P94-105 |
| Heavy dynamic penetrometer | NF P94-115 |
| Hand-augered borehole | NF P94-202 |
Deliverables
- Dated test certificates, referenced to the applicable standard
- Trial compaction strip record stating the compaction method adopted
- Borrow pit or quarry approval certificate
- Daily site reports
- Periodic summary sent to the works supervisor
- Immediate notification of any non-conformity
Projects for this service
- Geotechnical supervision of earth road rehabilitation in the Logone-et-Chari division, Far North — 3 lots, lot 3 Mara – Choloba section
- Geotechnical supervision of construction and rehabilitation of local buildings and community facilities, Sultanat and Lacka districts, Kousséri — 3 separate lots
- Construction works at the University of Garoua
- TRADEX depot access road works, Yaoundé
- Detailed design, geotechnical component — PACRI, Mora – Dabanga – Kousséri corridor